M00000144
New product
WRC Volume 49 No. 01-02 1994 Progress Reports Volume 49 No. 01-02 1994
Report / Survey by Welding Research Council, 1994
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 11/24/2021
CONTENTS
This volume includes the full Minutes of the Executive Committee and the Design Division. The balance of the PVRC Minutes, including those of the PVRC Materials and Fabrication Division, appear in the companion volume, March/April 1994 Progress Reports.
- Executive Committee, October 13, 1993
- JPVRC Progress Reports
- PVRC Operating Procedures
- Fatigue Coordinating Committee, October 11, 1993
- Task Group on Contining Operation of Equipment, October 11, 1993
- Design Division, October 13, 1993
- Committe on Bolted Flanged Connections, October 12, 1993
- Subcommittee on Gasket Testing and Elevated Temperature Flanged Joint Behavior, October 11, 1993
- Flanges Parameter Study Group, October 11, 1993
- Task Group on Valve Stem Emissions, October 12, 1993
- Committee on Dynamic Analysis and Testing, October 12, 1993
- Subcommittee on Dynamic Stress Criteria, October 12, 1993
- Committee on Elevated Temperature Design, October 12, 1993
- Progress Report on ""Characterization of Thermal-Mechanical Fatigue Response of Structural Materials"" The Pennsylvania State University
- Committee on Piping and Nozzles, October 11, 1993
- Subcommittee on Flexibility Models and Stress Intensification Factors, October 11, 1993
- Subcommittee on Long Range Planning, October 11, 1993
- Subcommittee on Shell Intersections, October 11, 1993
- Committee on Polymers for Pressure Components, October 12, 1993
- Committee on Shells and Ligaments, October 11, 1993