M00000128
New product
WRC Volume 50 No. 09-10 1995 Progress Reports Volume 50 No. 09-10 1995
Report / Survey by Welding Research Council, 1995
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 11/24/2021
CONTENTS
This volume includes the full Minutes of the Executive Committee, Design Division and Materials and Fabrication Division. The balance of the PVRC Minutes, including those of the PVRC Cyclic Life and Environmental Effects, appear in the companion volume, November/December 1995 Progress Reports.
- Executive Committee, June 7, 1995
- JPVRC Progress Reports
- Presentation at the Joint Meeting, June 7, 1995
- Fatigue Coordinating Committee, June 6, 1995
- Design Division, June 7, 1995
- Committee on Bolted Flanged Connections, June 6, 1995
- Subcommittee on Flange Parameter Study, June 5, 1995
- Subcommittee on Gasket Testing and Elevated Temperature Flange Joint Behavior, June 5, 1995
- Committee on Dynamic Analysis and Testing, June 6, 1995
- Subcommittee on Dynamic Stress Criteria, June 6, 1995
- Committee on Elevated Temperature Design, June 6, 1995
- Subcommittee on Shell Intersections, June 5, 1995
- Task Group on Large Diameter Shell Intersections, June 5, 1995
- Committee on Shells and Ligaments, June 5, 1995
- Materials and Fabrication Division, June 7, 1995
- Committee on Failure Modes of Components, June 6, 1995
- Committee on Nondestructive Examination, June 5, 1995
- Committee on Thermal and Mechanical Effects, June 6, 1995
- Committee on Welds, June 7, 1995
- Progress Report on Development of W-Bearing Low Carbon Cr-Mo Filler Metal for Cr-Mo Vessel and Piping Repairs, June 1995