M00000114
New product
WRC Volume 52 No. 01-02 1997 Progress Reports Volume 52 No. 01-02 1997
Report / Survey by Welding Research Council, 1997
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 11/24/2021
CONTENTS
This volume includes the full Minutes of the Executive Committee, Design Division and Materials and Fabrication Division.
The balance of the PVRC Minutes, including those of the PVRC Steering Committee on Cyclic Life and Environmental Effects, appear in the companion Volume, March/April 1997 Progress Reports.
Executive Committee, February 2, 1997PVRC/JPVRC Joint Meeting and JPVRC Symposioum for 20th AnniversaryReport to the PVRC Executive Committee - European Pressure Equipment Research Council (EPERC) - First General AssemblyJPVRC Action ReportDivision on Continued Operation of Equipment, February 5, 1997Committee on Flaw Evaluation, February 3 and 5, 1997Joint Task Group on Increased Code Allowable Stresses - Febraury 4, 1997Task Group on Inspection Planning - February 5, 1997Deisgn Division - February 5, 1997Committee on Bolted Flanged Connections, February 4, 1997Subcommittee on Flange Parameter Studies, February 3, 1997Subcommittee on Gasket Testing and Elevated Temperature Joint Behavior, February 3, 1997Committee on Dynamic Analysis and Testing, February 4, 1997Committee on Elevated Temperature Design, February 4, 1997Committee on Piping, Nozzles and Vessels, February 4, 1997Subcommittee on Shell Intersections, February 2, 1997Task Group on Large Diameter Shell Intersections, February 3, 1997Committee on Failure Modes, February 5, 1997Committe on Nondestructive Examination, February 4, 1997Committee on Thermal and Mechanical Effects on Materials, October 8, 1996Committee on Thermal and Mechanical Effects on Materials, February 3, 1997Committee on Welds, February 4, 1997