M00000523
New product
WRC Volume 44 No. 07-08 1989 Progress Reports Volume 44 No. 07-08 1989
Report / Survey by Welding Research Council, Inc., 1989
Welding Research Council, Inc.
In stock
Warning: Last items in stock!
Availability date: 11/24/2021
CONTENTS
- Executive and Main Committee, June 7, 1989
- Task Group on Continued Operation of Equipment, June 5, 1989
- Steering and Technical Committees on Piping Systems, June 5, 1989
- Report on Review and Simplificaiton of ASME Sections III XI
- JPVRC Progress Report, March 1989
- Design Division, June 7, 1989
- Joint Task Group on Elevated Design Behavior of Bolted Flanges, June 6, 1989
- Subcommittee on Reinforced Openings and External Loadings, June 6, 1989
- Subcommittee on Piping, Pumps, and Valves, June 7, 1989
- Subcommittee on Dynamic Analysis, June 6, 1989
- Subcommittee on Elevated Temperature Design, June 7, 1989
- Materials and Fabrication Division, June 7, 1989
- Subcommittee on Nondestructive Examination of Components, January 16, 1989
- Subcommittee on Thermal and Mechanical Effects on Materials, June 7, 1989
- Task Group on Damage Assessment of Life Extension and s/c on Elevated Temperature Behavior of Components
- Subcommittee on Failure Modes of Components, October 12, 1988