M00002429
New product
TIA-102.BBAB 2009 Edition, July 1, 2009 Project 25 Phase 2 Two-Slot Time Division Multiple Access Physical Layer Protocol Specification
In stock
Warning: Last items in stock!
Availability date: 09/09/2021
Description / Abstract:
Project 25 digital radio systems will optionally support a trunking mode of operation. This document provides an overview of the essential attributes of the trunking control channel messaging such that, where systems are configured in the trunking mode, voice and data services will operate in accordance with the goals of Project 25:
• support any Project 25 trunking radio,
• interoperate across any Project 25 digital radio trunking system,
• independent of the particular equipment manufacturer,
This document will describe the presentation on the trunking system with respect to the Inbound Signaling Packet (ISP) and Outbound Signaling Packet (OSP) of the control channel.