M00002182
New product
TIA-4945 Revision A, April 1, 2013 Dynamic RAN Power Management Stage 1 Requirements
In stock
Warning: Last items in stock!
Availability date: 09/09/2021
Description / Abstract: This document provides the requirements for Dynamic RAN Power Management (DRPM). DRPM allows operators to control the power usage of RAN equipment dynamically. Such control includes powering off RAN equipment in times of low traffic, powering on RAN equipment in times of high traffic, consideration for emergency services, response to equipment failure, and scheduling of power management activities.