Reduced price! View larger

TIA-102.CAEA

M00002022

New product

TIA-102.CAEA Revision A, June 1, 2016 Project 25 Conformance Profile Level One- Basic Conventional Operation

More details

In stock

$62.78

-57%

$146.00

More info

Description / Abstract: This document is intended to clarify key aspects of the operation of Project 25 subscriber, base, and repeater station equipment in the interests of conformance.

It includes a set of PCP items or procedures for basic conventional operation as follows:

PCP 1.1 – Voice Calls



  • PCP 1.1.1 – Group Call via Repeater Operation


  • PCP 1.1.2 – Individual Call via Repeater Operation


  • PCP 1.1.3 – Group Call Direct Operation


  • PCP 1.1.4 – Individual Call Direct Operation


It is consistent with other pertinent APCO Project 25 Conformance Profiles, namely:

Project 25 Conformance Profile – Level 2 (Advanced Conventional Operation)

Project 25 Conformance Profile – Level 3 (Basic Trunking Operation)

Project 25 Conformance Profile – Level 4 (Advanced Trunking Operation)

Project 25 Conformance Profile – Level 5 (Phase II Trunking Operation)

This document is primarily aimed at manufacturers and conformance test facilities to serve as a standard reference of conformant air interface signaling, as a means of assisting manufacturers in the development of conformant Project 25 equipment. It also defines a framework against which manufacturers may describe the conformant behaviour of their Project 25 products

It is not designed as a functional interoperability test suite for end users, for which readers are referred to [7].

This document assumes an audience familiar with terms and definitions contained in the APCO P25 standards.