Reduced price! PIP CVS02100 View larger

PIP CVS02100

M00000049

New product

PIP CVS02100 Site Preparation, Excavation, and Backfill Specification

standard by Process Industry Practices, 05/01/2001

More details

In stock

$43.00

-57%

$100.00

More info

Full Description

This Practice provides the Contractor with site preparation, excavation, and backfill requirements. This Practice describes the requirements for excavation, placement, inspection, and management of earthen and organic materials during the site preparation, excavation, and backfill phase of a construction project.

For excavation and backfill specifications for underground pipes, see PIP CVS02700. Excavation and backfill requirements from PIP CVS02315 have been incorporated into this Practice; therefore, PIP CVS02315 is now obsolete. This document is a complete revision of PIP CVS02100, and therefore revision markings are not provided.