New product
Warning: Last items in stock!
Availability date:
This addendum addresses control of fans in fan powered parallel VAV boxes. The fan is only required during heating; however, these fans may be programmed to run continuously during occupied hours. The addendum also requires the fan operation to be used as the first stage of heating and allows fan operation in response to DCV ventilation requests.
Author | ANSI/ASHRAE/IES |
---|---|
Editor | ASHRAE |
Document type | Standard |
Format | File |
Confirmation date | 2016-06-30 |
ICS | 91.120.10 : Thermal insulation of buildings
|
Modify | ANSI/ASHRAE/IESNA 90.1 (2013) |
Year | 2016 |
Document history | |
Country | USA |
Keyword | ANSI 90;ANSI/ASHRAE/IES 90;90;ANSI/ASHRAE/IES 90.1bk-2016 |