Reduced price! View larger

API RP 11S 4:2002 (R2013)

New product

API RP 11S 4:2002 (R2013)

Recommended Practice for Sizing and Selection of Electric Submersible Pump Installations

More details

$34.38

-57%

$79.95

More info

Each component of the ESP system (pump, motor, intake, seal or protector, cable, switchboard, etc.) is discussed in some detail as far as what must be considered for the best selection at a desired rate and well conditions. Examples are given to illustrate the basic design procedure and illustrate how PVT correlations, multiphase flow correlations, and inflow performance relationships are used. Summary designs and computer examples using the detailed design principles are presented which show how design considerations fit together, and how tools such as computer programs allow faster solutions resulting in easier trial and error calculations for optimization of designs and study of existing installations. Topics such as PVT correlations, multiphase flow correlations, and inflow performance relationships are discussed in the appendices.

Author API
Editor API
Document type Standard
Format File
Confirmation date 2013-10-01
ICS 75.180.10 : Exploratory, drilling and extraction equipment
Number of pages 44
Replace API RP 11S 4 (1993)
Cross references GB/T 17386 (2009), MOD
Year 2002
Document history API RP 11S 4 (2002-07)
Country USA
Keyword API 11S;11S;API RP 11S4