New product
Warning: Last items in stock!
Availability date:
The oil and gas industry has experienced rig failures and movement of rig components during recent hurricanes in the Gulf of Mexico. Some, if not all, of the failures are attributable to the tie-down components. Occurrences on both fixed and floating platforms have resulted in significant platform damage as well as lost and/or deferred production. Recent experience shows that enhancements to current industry practice can improve tie-down performance during hurricanes.
Author | API |
---|---|
Editor | API |
Document type | Standard |
Format | File |
ICS | 75.180.10 : Exploratory, drilling and extraction equipment
91.120.99 : Other standards related to protection of and in buildings |
Number of pages | 14 |
Year | 2006 |
Document history | |
Country | USA |
Keyword | API 2TD;2TD |