Scope
The scope of this guide is to provide methodology, requirements and practices for both the users and suppliers for a systematic and coordinated approach for development of specification for turnkey substation projects. This guide covers the technical requirements to develop the specifications for the engineering, procurement, construction, testing and commissioning, quality assurance/quality control and training for substations. The contractor should furnish all equipment, materials, and services as specified by the purchaser. The purchaser is responsible for the project data and information for use by the contractor in the proposal. If either party supplies technical data, that party is responsible for the data accuracy.
Purpose
The purpose of this guide is help users and suppliers in specifying requirements and guidance for formulating complete specifications for turnkey substations or projects.
Abstract
Revision Standard - Active. Systematic methodology, guidelines and practices for developing turnkey substation specifications are provided in this guide. Guidance on engineering, procurement, construction, testing and commissioning, quality assurance/quality control and training is provided.

Author IEEE
Editor IEEE
Document type Standard
Format File
ICS 29.080.30 : Insulation systems
29.240.10 : Substations. Surge arresters
Number of pages 47
Replace IEEE 1267:1999
Year 2019
Country USA