Reduced price! View larger

API RP 19G5:2019

New product

API RP 19G5:2019

Operation, Maintenance, Surveillance, and Troubleshooting of Gas-lift Installations, First Edition

More details

$76.69

-57%

$178.35

More info

This document assists gas-lift system operators, analysts, technicians, engineers, and others in understanding how to effectively plan, operate, maintain, troubleshoot and provide surveillance for gas-lift systems and gas-lift wells.
These recommended practices discuss continuous gas-lift with injection in the casing/tubing annulus and production up the tubing. Annular flow gas-lift (injection down the tubing and production up the annulus), dual gas-lift (two tubing strings in the same casing), and intermittent gas-lift are mentioned; however, most of the discussion focuses on conventional continuous gas-lift.

Author API
Editor API
Document type Standard
Format File
Edition 1
ICS 75.180.10 : Exploratory, drilling and extraction equipment
Number of pages 99
Year 2019
Country USA